Villa elevators need cost in all aspects, then what factors will affect the cost of villa elevators, there are many factors of impression, then the Villa Elevator manufacturers will come to introduce you to this knowledge, together with this article Learn about.

First, the elevator operating costs

  1. Electricity fee;

2, elevator door repair costs (if there is a maintenance contract, only the maintenance costs);

3, if the villa elevator annual inspection, you also need to pay the annual inspection fee (not annual inspection can be ignored);

  1. Damage to repair or replacement of accessories.

Second, the elevator purchase cost

Elevators must comply with national standards, so elevator costs need to be cost-analyzed if the manufacturer meets national standards. The cost analysis was carried out with a 1000 KG, 1.0 M/S, 6-story elevator.

Elevator costs should include the following components: component costs, fixed costs, procurement and sales expenses, labor wages, energy consumption, packaging, and profits and taxes. This part of the cost is unmovable, and the only flexibility is profit.

What factors will affect the cost of villa elevators [recommended today]

The profit of the elevator manufacturer is generally divided by the cost of all ex-factory prices divided by 0.9 as the lowest price. Accounting for a common organic room elevator, regardless of the size of the enterprise, the size of the brand, a 1000KG, 1.0M / S, 6-story 6-station 6-door, VVVF control, stainless steel car and first-layer stainless steel door, the factory cost is about 9 Between 10,000 and 105,000/set, the factory ex-factory price is about 100,000 to 120,000/set. The ex-factory price of general elevator enterprises does not include sales expenses, so the sales price of elevators is 5% higher than the cost price, mainly sales expenses and sales management expenses. Therefore, the price of direct sales or agents to enterprises is about 105,000-16,000 yuan/set. The price of adding a layer at the same speed is about 4500-5000 yuan. All of the above prices are the latest parts. If the sales price is less than 100,000 units per purchase, it is difficult to guarantee that all are the latest parts.

Generally, before the elevator company delivers the price of all components, the basic price is basically paid, so the only way to obtain the lowest price is to pay more than 85% of the elevator equipment before the delivery of the equipment. If only 50% is paid, the elevator company must calculate the loan interest and risk, so the sales price must be higher than the basic accounting price. The payment method of the elevator procurement contract is to pay 85%-95% of the elevator equipment before delivery.